No. | Term | Definition |
1 | Transmission Facility | The transmision substation and/or line cable equipment (66kV and above) or part thereof. It shall also include the distribution equipment in the transmission substation. |
2 | Site Acceptance Test (SAT) | Pre-commissioning test performed on the transmission facility before PIAT |
3 | Pre-commissioning Inspection and Testing (PIAT) | Quality Assessment activity performed by PCU after the successful completion of SAT to determine the readiness of the Transmission Facility to be energised. |
4 | Primary Injection | Testing by means of injecting current into the primary circuit to verify the CT Ratio, CT Polarity and the CT secondary circuits. It is not being considered as a stability test. |
5 | Stability Test | It is the test to asess unit protection as a complete scheme thatremain unstable for all out-zone faults and operate only for in-zone faults. |
6 | Unit Protection | Protection system with a clearly defined zone of protection and it is usually demarcated betwenn 2 or more sets of CT's. |
7 | On-Load Test | It is the test or measurement for by means of using the energised secondary voltage and secondary load current after a circuit has been energised. |
8 | Live Plant | A fenced area with energised high voltage equipments. |
9 | Live Bay | A transformer, line/cable, bus coupler or bus section bay that being energised at high voltage. Since the word is "LIVE", those equipments basically is not isolated or earthed. |
10 | Electrical Service Engineer | A person who being certified by Energy Commission to carry-out the work. |
11 | PTT | Protection, Telecommunication & Telecontrol Department in TNB Transmission Division. |
Aug 11, 2011
TNB's Term For Newbies
For those who are newbies with working related with Tenaga Nasional Berhad, this are few technical term that commonly used.